Hello friends! I've been following along on this forum for the past few months and a big shout out to @DuraYuk for the dealership and sales person recommendation here in ATL. I am planning on keeping this thread updated as new updates come in for my 2023 Yukon 3.0 Duramax Denali XL (Lots of words there) build as my order has finally been accepted by GM this week! Hopefully this gives some folks a general idea on how long it takes for this type of order to be built and delivered.
Build Details:
2023 Yukon XL
Drive Type: 4WD
Trim: Denali
Engine: 3.0L Duramax Turbo Diesel
Color: Sterling Metallic
Interior Color: Jet Black
Packages: Max Trailering Package (I had to remove this from the build as the dealership told me it was the only thing currently on constraint and holding GM up from accepting the order)
Exterior Options: Power-retractable assist steps,Adaptive Air Ride Suspension (had to remove AARS as the Max Trailering Package is required for AARS)
Interior Options: Power-release second row 60/40 split-folding bench seat
Timeline:
1-6-2023: Order and deposit placed with the dealership
2-9-2023: Order officialy accepted by GM (Event Code 2000)
Build Details:
2023 Yukon XL
Drive Type: 4WD
Trim: Denali
Engine: 3.0L Duramax Turbo Diesel
Color: Sterling Metallic
Interior Color: Jet Black
Exterior Options: Power-retractable assist steps,
Interior Options: Power-release second row 60/40 split-folding bench seat
Timeline:
1-6-2023: Order and deposit placed with the dealership
2-9-2023: Order officialy accepted by GM (Event Code 2000)