Current build time for 2022 Yukon Denali

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

Monkey01

Member
Joined
Oct 18, 2021
Posts
35
Reaction score
10
Hi,

Does anyone have some experience on current build time for 2022 Yukon Denali? Time frame from GMC officially accepting the order (12/17/2021 accepted) to finish producing the vehicle. I have a basic build order of Satin Steel Metalic with all black interior. No other option. Thanks in advance for your input.
 
Last edited:

dcyy

Member
Joined
Jul 18, 2012
Posts
74
Reaction score
31
Hi,

Does anyone have some experience on current build time for 2022 Yukon Denali? Time frame from GMC officially accepting the order (12/17/2021 accepted) to finish producing the vehicle. I have a basic build order of Satin Steel Metalic with all black interior. No other option. Thanks in advance for your input.
Finally got a call from my dealer for available allocation. Ordered placed 12/10 for 22 Yukon Denali-was accepted with a build date of 1/24/22.Already been notified the chrome 22"s (sf2) out of stock.So with build time and delivery who knows. Traded a 19 Denali with 12200 miles so I get to drive that most of the winter
 
OP
OP
M

Monkey01

Member
Joined
Oct 18, 2021
Posts
35
Reaction score
10
Finally got a call from my dealer for available allocation. Ordered placed 12/10 for 22 Yukon Denali-was accepted with a build date of 1/24/22.Already been notified the chrome 22"s (sf2) out of stock.So with build time and delivery who knows. Traded a 19 Denali with 12200 miles so I get to drive that most of the winter
Hi,

May I ask how you to find the production build date or status after GMC officially accepted the order? Thank you.
 

dcyy

Member
Joined
Jul 18, 2012
Posts
74
Reaction score
31
After order is accepted the dealer can tell you the order# and build date.If you go on GMC web site and get into "chat" you can ask for status.
codes that start in the 4's
  • 4000 Available to Ship
  • 4104 Bailment Invoice (shiping doc's)
  • 4106 Release Bailment
  • 4110 Invoice Reject
  • 4120 Internal Invoice
  • 4150 Original Invoice
  • 4200 Shipped
  • 4250 Ocean Dispatched
  • 4300 Intermediate Delivery
  • 4350 At Port of Exit – Truck
  • 4800 Rail Ramp Unload
  • 4850 At Port of Exit – Rail
  • 4B00 Bayed (Available to Ship)
  • 4B01 Arrived at Vehicle Distribution Center
  • 4B10 Available for Export Shipping
  • 4B11 Available for Sale
  • 4B12 Argentina Built Order Ready for Re-Invoice to Mexico
  • 4B31 Anticipated Tag
  • 4B40 Grounded Tag
  • 4B42 Untag
  • 4B45 Credit Rebill Rejected
  • 4B50 Final Dealer Assigned by Central Office
  • 4B60 Credit Rebill Sent to Vehicle Billing and Accounts Receivable System
  • 4B65 CDO Requests Created (GM International Sales Only)
  • 4B70 Credit Rebill Cancelled in Vehicle Billing and Accounts Receivable System
  • 4D00 Vehicle on Hold (typically quality control but can be any reason such as parts missing)
  • 4DCR Carrier Reject
  • 4F01 Vehicle Arrived at Central Distribution Center
  • 4F02 In Transit to Regional Distribution Center
  • 4F03 Vehicle Arrived at Regional Distribution Center
  • 4F04 Vehicle Tagged in Transit to Dealer
  • 4FCR Invoice Reject
  • 4FUN Credit Dealer/Undo Invoice
  • 4V01 Vehicle at Upfitter
  • 4V02 Vehicle on Transportation Hold
  • 4V03 Estimated Delivery Date Updated

2021 GMC Sierra Denali Ultimate
an ask for status. All status codes have been previously published on this site
 
OP
OP
M

Monkey01

Member
Joined
Oct 18, 2021
Posts
35
Reaction score
10
Thank you. I tried that and said it's accepted and moving towards production. No status code yet.
 

Forum statistics

Threads
132,717
Posts
1,873,138
Members
97,542
Latest member
RRogerson
Top