Dantheman1540
Full Access Member
This band saw gets it! Got the rest of the cuts I need cut and mocked up. As well as finally cutting the hole that the CAI box draws from. Don’t really think it will make a lick of difference but I had the grinder out and why not.
Gonna try to remove the painters tape while marking each individual piece in order and in orient so they can be reassembled with tack welds one at a time. Also ordered a straight 4”ID-4”ID silicon coupler to mate the TB and tube together as well as a 4.25”-4” coupler for the tube to meet the filterneck. I need to dig into my stash and find the IAT sensor I ordered long ago so I can relocate that and delete the MAF.
So far is have about $110 in material. I’m gonna keep track of the amount of time and filler rod it takes to weld it so I can estimate the cost.
Gonna try to remove the painters tape while marking each individual piece in order and in orient so they can be reassembled with tack welds one at a time. Also ordered a straight 4”ID-4”ID silicon coupler to mate the TB and tube together as well as a 4.25”-4” coupler for the tube to meet the filterneck. I need to dig into my stash and find the IAT sensor I ordered long ago so I can relocate that and delete the MAF.
So far is have about $110 in material. I’m gonna keep track of the amount of time and filler rod it takes to weld it so I can estimate the cost.
Attachments
-
47654AD7-E78D-447E-91AC-DD93873A1D14.jpeg456.6 KB · Views: 6
-
7B86B7A0-4D32-4A76-99D9-7708AFAFB4BD.jpeg610.3 KB · Views: 6
-
E539C436-8E10-45FB-926E-ECAB3170E277.jpeg401.8 KB · Views: 5
-
C723F8F9-CA1D-42D7-A37D-9DEE38590A54.jpeg359.6 KB · Views: 4
-
81C67B0D-D0EE-41C0-9FAF-ADDD7BF3A7C8.jpeg242.7 KB · Views: 6