Haha. Well if I do one line to the cooler I might as well do the other that returns back. And THEN I see the whole assembly with new cooler is 60-ish and so I may just buy whole thing.That return line is molded for a reason. Spend the $25 you cheapskate! LOL!
Gosh. 50 in 2 molded hoses and fittings or 60 for it all set to go in asm?
That's why I'm asking. Sounds like I'm doing the 60 asm most likely.