***UPDATE***
Build Details:
Order Type: Retail Sold (Ive seen a few threads how dealers order customer vehicles in the OderWorkbench system so FWIW)
2023 Yukon XL
Drive Type: 4WD
Trim: Denali
Engine: 3.0L Duramax Turbo Diesel
Color: Sterling Metallic
Interior Color: Jet Black
Packages: Max Trailering Package (I had to remove this from the build as the dealership told me it was the only thing currently on constraint and holding GM up from accepting the order)
Exterior Options: Power-retractable assist steps, Adaptive Air Ride Suspension (had to remove AARS as the Max Trailering Package is required for AARS), 22" Wheels - Multi-Spoke High Gloss Black
Interior Options: Power-release second row 60/40 split-folding bench seat, Panoramic Sunroof
Timeline:
1-6-2023: Order and deposit placed with the dealership
2-9-2023: Order officialy accepted by GM (Event Code 2000)
2-15-2023: Order accepted by production control (Event Code 3000)
2-20-2023: Order Broadcast for Production - Loaded on Assembly Plant Computer (Event Code 3400) - Target Production Week of 2/27/2023!!!
3-6-2023: Intermediate Delivery (Event Code 4300)!
Looks like its on the way to the dealership. Does anyone know how long this process typically may take to go from 4300 to 5000? I know it is built in Dallas/Arlington, TX and I am located in the Atlanta, GA metro area. I would fly into Dallas and pick it up if they would let me. Overall it looks like it took about 3 weeks (25 days) from the day the order was accepted by GM (Event Code 2000) to it being built and starting the shipment and delivery process (Event Code 4300). I hope this gives folks a general idea on timeline for the builds. Now fingers crossed it doesnt take very long to get from Dallas to Atlanta.