What did you do to your NNBS GMT900 Tahoe/Yukon Today?

Disclaimer: Links on this page pointing to Amazon, eBay and other sites may include affiliate code. If you click them and make a purchase, we may earn a small commission.

Rocket Man

Mark
Supporting Member
Joined
Dec 25, 2014
Posts
26,004
Reaction score
50,860
Location
Oregon
Nothing interesting.

Tahoe stuff:

Replace the radiator

Install the trans cooler

There's always more on the Tahoe but that's the immediate list



Others, pertaining to the materials being stored:

Repair/modify/upgrade a lawn tractor that's going to my stepdad

Finish the Crispy Cart

Reorganize my metal stocks

Reorganize and clean... everything in the shop

Fix or flip a Honda generator I picked up cheap

Refurbish a light fixture for the dining room

Build and install frames for all bathroom mirrors

Replace a few fascia boards and clean the others then paint the house

Landscape the yard- all of it needs something

Replace my drop-in shower unit with tile

Replace some floor tiles in the kitchen

Refinish the front doors

And more.


Other than the immediate Tahoe needs, I'm purging trash. They're building a house next to me and it'll be the last one on my street as it was the last vacant lot. So, this is the last time I'll have easy access to a roll-off dumpster and it's right next door. Gotta seize the opportunity.
Sounds like mine sorta but I’ve knocked most of it out. All my stuff is indoors though since it’s cold here and now that I’m not getting paid to work in the cold.....I don’t. I just painted my kitchen and dining room. Twice. In one day. The first color looked great in the pictures but not so much on the walls. Then day before yesterday I added ducting and a 7” vent through the roof for my vent hood/ microwave that has been recirculating air for the last 10 years. You could say that project took me awhile to start. Your weather is probably better for working outside now instead of summer though I imagine.
 

iamdub

Full Access Member
Joined
Apr 23, 2016
Posts
20,821
Reaction score
44,932
Location
Li'l Weezyana
Sounds like mine sorta but I’ve knocked most of it out. All my stuff is indoors though since it’s cold here and now that I’m not getting paid to work in the cold.....I don’t. I just painted my kitchen and dining room. Twice. In one day. The first color looked great in the pictures but not so much on the walls. Then day before yesterday I added ducting and a 7” vent through the roof for my vent hood/ microwave that has been recirculating air for the last 10 years. You could say that project took me awhile to start. Your weather is probably better for working outside now instead of summer though I imagine.

For weather, today and the past few days have been great. We're currently in our crappy rollercoaster weather. It'll be really nice (40s for lows then quickly warming to lower 70s for highs) for one to three days, then it storms for a day or two, followed by 20s-40s for a few days warming up a little each day. Then, we'll have another really nice day or three before another storm comes and the cycle continues. Other than ice, weather doesn't affect my work and I have no set schedule, so I can't get involved in any projects that have to be finished that day (such as your cutting a hole in the roof) because I won't know when I'll be able to get back to it.
 

08z71bgm

Supporting Member
Joined
Jul 2, 2020
Posts
758
Reaction score
1,108
Location
Long Island, NY
Nothing interesting.

Tahoe stuff:

Replace the radiator

Install the trans cooler

There's always more on the Tahoe but that's the immediate list



Others, pertaining to the materials being stored:

Repair/modify/upgrade a lawn tractor that's going to my stepdad

Finish the Crispy Cart

Reorganize my metal stocks

Reorganize and clean... everything in the shop

Fix or flip a Honda generator I picked up cheap

Refurbish a light fixture for the dining room

Build and install frames for all bathroom mirrors

Replace a few fascia boards and clean the others then paint the house

Landscape the yard- all of it needs something

Replace my drop-in shower unit with tile

Replace some floor tiles in the kitchen

Refinish the front doors

And more.


Other than the immediate Tahoe needs, I'm purging trash. They're building a house next to me and it'll be the last one on my street as it was the last vacant lot. So, this is the last time I'll have easy access to a roll-off dumpster and it's right next door. Gotta seize the opportunity.
It’s time for my indoor list. I’m building some sliding closet doors for my bedroom. It’s a crazy large opening and don’t want to frame it smaller. Each door will be 48x93 in a shaker style. Two panels per door.

After that learn how to build cabinets for my laundry room so I can redo my kitchen after.

In between all of this I need to do some plumbing and convert old copper to pex on heat and domestic. Having some corrosion/electrolysis issues with the copper in the house which is why I have been swapping it over to pex.
 

Rocket Man

Mark
Supporting Member
Joined
Dec 25, 2014
Posts
26,004
Reaction score
50,860
Location
Oregon

George B

¯\_(ツ)_/¯
Joined
Feb 5, 2020
Posts
7,769
Reaction score
18,599
Location
Oconomowoc, Wisconsin 53066

Forum statistics

Threads
132,235
Posts
1,864,460
Members
96,782
Latest member
01burb79
Top