#1taho
5150TAHO
so I am in construction and because of the cold I get payed off. It's a good break but I get board at home with two months off. So I picked up a small job to keep me busy and make some cash.
69 cuda convertible. Taking the three speed out and putting in a four speed. Repainting under the hood and reassemble. Should be a good two week project as long as all the parts show up at the same time.
69 cuda convertible. Taking the three speed out and putting in a four speed. Repainting under the hood and reassemble. Should be a good two week project as long as all the parts show up at the same time.