Hoe385
TYF Newbie
- Joined
- Dec 27, 2014
- Posts
- 18
- Reaction score
- 0
So yesterday I finally decided to tear apart some of my trunk and lay down some wood flooring. It took me about 2 hours provided I wasn't really confident in all I was doing. Toughest part was probably cutting the wood down to "exact" measurements within the trunk space behind all the paneling. A lot of guesstimating on my part. Anyways here's some pics of the start to finish.
T50 size screw. Needed to get under the carpet and cut out insulation so the wood would fit on top of the carpet between all the plastic paneling.
Final Result
Sent from my iPhone using Tapatalk
Final Result
Sent from my iPhone using Tapatalk