I didn't know if you were using a guide or not. but I mainly posted the info for the sake of the thread and adding useful content for others searching the subject. I just copy/paste so it's all legit and nothing to really question.
First HG job I researched for months, talked to 3-dif guys directly. Had them on speed dial/text and a workshop manual to walk me through, plus some forum threads with extra details, trials & tribulation of other's sagas in real time, kept up-2-date... and I didn't miss a lick on anything that was within my control. It took longer than I wanted but I worked slowly/methodically and updated many other components. I spent many hours cleaning pushrods and rebuilding the original lifters since they were all collapsed. I set up a rig and spray-tested all of the fuel injectors. Replaced the oil seals, polished the intake mani, surfaced and gasketed the TB and new coolant hoses that I bypassed from leakage. 1-thing after another.
From my experience, it's hard to put a time of completion for the average DIY. I don't even pay attention to the rec time since that's more for professional billing hours where a customer can be quoted labor charges. I just secure other means of transport in situations like this.
I had only been wrenching seriously for the 12-months I had owned that vehicle before that undertaking and now I replace tie rods on my 30-min lunch break today. There are just so many details involved with a dependable & secure HG R&R that it makes 99% of future repairs seem like elementary. But I still preview the WM for everything, nevertheless.